BEVERLY BEACH IMPROVEMENT CLUB

Monthly Water Audits for 2015-2016
d02@whidbey.com
7.8.16
These water audits attempt to balance the measured water pumped at the well head
with water used:
  1. by the customers (metered and including leaks within the customer's system),
  2. backwashing the filters (metered)),
  3. Flushing the mains or tanks (estimated) and
  4. leaked from our distribution system (estimated).
All figures are in gallons.



Aug
Sep Oct Nov
Dec
Jan Feb
Mar
Apr
May
Jun
Jul
Water
Pumped
516,700
261,400
216,100
151,300
195,600
162,000
182,300
192,600
267,330
364,700
327,700
446,200
Metered
To Customer
389,450
220,080
189,780
141,690
140,820
142,877
145,502
143,050
192,760
249,990
234,970
409,770
Backwashed
Through Filters
42,700
21,700
12,300
5,700
22,000
5000
16,400
18,400
28,400
15,400
26,500
16,500
Flushing
Mains or Tanks
41,640
17,640
10,500
3,300
27,000
6000
18,000
19,000
29,000
16,000
26,000
16,900
Leaks (est)/Other
18,430
730
1,200
-
-
-
-
7,000*

80,000**
15,000

Total Used
492,220
260,150
213,780
150,690
189,820
153877
179,902
187,450
250,160
361,390
302,470
443,170
Unaccounted water
24,480
1,250
2,320
610
5,780
8,123
2,398
5,150
17,170
3,310
25,230
3,030
Percentage
Unaccounted
4.7%
0.5%
1.1%
.40%
3.0%
5.0%
1.3%
2.7%
6.4%
0.9%
7.7%
.68%
Notes:* Leak at McKenzie's
            **Fill #2 Tank



Site Created By David Demorest
Phone: (360) 730-1553   Email: d02@whidbey.com